The Project Includes Design, Construction, Supply, Erection/Installation, Testing and Commissioning of 132/11.5 kV GIS Grid Station Majorly Consisting of Two (02) Line Bays, Four (04) Transformer Bays, Two (02) 31.5/40MVA Power Transformers and Residential flats for LESCO Staff.