NETRACON Technologies has successfully designed and constructed Seven (07) 132kV Grid Stations on behalf of Hyundai Engineering Company (HEC) in GEPCO region. The scope of work was to execute complete design, civil works, installation of equipment, Testing and Commissioning of Six (06) 132kV AIS Grid Stations at Hafizabad, Pindi Bhattian, Awan Sharif, Phalia, Gujrat, Chianwali and one (01) 132kV GIS Grid Station at Sialkot.
132kV AIS Grid Station, (10) & 132kV GIS, Grid Station, GEPCO
GEPCO Projects - 132kV GIS Sheranwala Bagh & 132kV AIS Khyali By Pass on behalf of ABB & Seven (07) 132kV Grid Stations on behalf of Hyundai Engineering Company & 132 kV Single Circuit Transmission Line on behalf of SIEMENS.
NETRACON Technologies constructed, installed equipment, tested & commissioned two (02) 132 kV Grid Stations of Kolo Tarar & Jalalpur Nau in GEPC region along with accomplishing the Turnkey Job of 132 kV Single Circuit Transmission Line including Supply of Equipment/Material, Foundation works, Erection of towers, Tension Stringing of conductor to feed both the Grid Stations on behalf of SIEMENS.
NETRACON Technologies designed & constructed civil works, installed equipment, tested & commissioned 132kV GIS Sheranwala Bagh & 132kV AIS Khyali By Pass Grid Stations in GEPCO region on behalf of ABB.