220kV Transmission Line, Kunduz – Taloqan, Afghanistan

Design, Supply & Installation for Kunduz - Taloqan 220kV Double Circuit Transmission Line. - DABS/001/ICB.

Design, Supply & Installation for Kunduz – Taloqan 220kV Double Circuit Transmission Line. – DABS/001/ICB.

The scope of the project was to construct 65.5Km long 220kV Double Circuit Kunduz-Taloqan Transmission line. It includes:

Preliminary Works

Design, detail survey including route alignment and profiling and plotting, right of way identification and clearance, tower spotting, optimization of tower locations, soil resistivity measurements, geotechnical investigations.

Supply

Supply of steel lattice towers, Conductors, OPGW, Insulators, Hardware and fitting accessories.

Construction

Construction of foundations, Tower Erection, Stringing and Final Tensioning of Conductors and OPGW, Grounding works, Testing and Commissioning.

Date of Start: December, 2011

Date of Completion: November, 2013

Client: DABS / KEC Int’l

I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Project Completion Certificate

ASK US