The scope of the project was to construct 65.5Km long 220kV Double Circuit Kunduz-Taloqan Transmission line. It includes:
Preliminary Works
Design, detail survey including route alignment and profiling and plotting, right of way identification and clearance, tower spotting, optimization of tower locations, soil resistivity measurements, geotechnical investigations.
Supply
Supply of steel lattice towers, Conductors, OPGW, Insulators, Hardware and fitting accessories.
Construction
Construction of foundations, Tower Erection, Stringing and Final Tensioning of Conductors and OPGW, Grounding works, Testing and Commissioning.
Date of Start: December, 2011
Date of Completion: November, 2013
Client: DABS / KEC Int’l