220/132kV AIS Substation, Mansehra, Pakistan

Construction of 220/132kV AIS Grid Station in Mansehra

The project includes the construction of a 220/132kV AIS Grid Station in Mansehra.

The job was executed for Chint Electric China which includes complete Design, Civil works, Installation, Testing, and Commissioning of Two (02) Transformer bays of 220kV with 250 MVA Power Transformer, One (01) Transformer Bay of 132kV with 13MVA Power Transformer, four (04) 220kV line bays, and six (06) 132kV Line bays.

The civil works include the design and construction of the double-story building of 1085 sq. ft for indoor equipment, Switchyard foundations for outdoor equipment, Trenches for cables, and RCC roads.

Client: National Transmission & Despatch Company (NTDC)

Consultant: National Engineering Services Pakistan (NESPAK) 

Date of Energization: 04th Apr 2018 

Project Completion Certificate