The project includes the construction of a 220/132kV AIS Grid Station in Mansehra.
The job was executed for Chint Electric China which includes complete Design, Civil works, Installation, Testing, and Commissioning of Two (02) Transformer bays of 220kV with 250 MVA Power Transformer, One (01) Transformer Bay of 132kV with 13MVA Power Transformer, four (04) 220kV line bays, and six (06) 132kV Line bays.