Detailed Inspection & Survey, Plan/Profile Preparation, Foundation repair, Erection of new Towers, Rehabilitation of old towers by fabricating the new components to replace the damaged ones including Re-erection of damaged towers and Tension Stringing of 110kV D/C T/Lines with 6 conductors & OPGW of the following sections:

  • Nagloo Power Plant to Kabul East SS                                 198 Locations (57 Km)
  • Kabul East to Kabul North SS                                              84 Locations (31 Km)
  • Derivation for Mahiper Power Plant                                  15 Locations (4 Km)
  • Derivation for Pull e Charkhee SS                                       16 Locations (5 Km)
Scope:
  • Detailed Inspection, Topographic Survey, Profile Preparation, Foundation Repair, Erection of new Towers, Rehabilitation of Existing Towers by Fabrication of components to replace the Damaged/Missing Components, Dismantlement & Re-erection of Partially Damaged Existing Towers and Tension Stringing of 110 kV D/C T/Line with 6 Conductors & OPGW from Naghloo Power Plant to Kabul East Sub Station.
  • Detailed Inspection, Topographic Survey, Profile Preparation, Foundation Repair, Erection of new Towers, Rehabilitation of Existing Towers by Fabrication of components to replace the Damaged/Missing Components, Dismantlement & Re-erection of Partially Damaged Existing Towers and Tension Stringing of 110 kV D/C T/Line with 6 Conductors & OPGW from Kabul East to Kabul North Sub Station.

Date of Start: 15th June, 2005

Date of Completion: 10th October,2007

Client: MEW / SMEC / KEC Int’l