Procurement, Design, Supply, Erection, Stringing, Testing, and Commissioning of 85 km (approx.) 132 kV Transmission Line and Grid Stations.
132kV Transmission Line, GGHPP Package- II, Golen Gol, Chitral
GGHPP Lot 4.2 - Procurement, Design, Supply, Erection, Stringing, Testing and Commissioning of 85 km (approx.) 132 kV Transmission Line and Grid Stations
GGHPP Lot 4.2
About Project
This is the second lot of the GGHP TL Project. This section of the Transmission Line connected the Golen Gol Power house with National Grid at Mardan. Two (02) Nos. of Grid station were also constructed at Timergarah and Chakdara. The Line passes through the mountainous region of upper Dir
- Location:
- Chukiatan to Timergara, KPK, Pakistan Altitude (+3100 to 1100 M)
- Employer:
- Water And Power Development Authority (WAPDA)
- Engineer:
- Fichtner, Stucky, PESS, BAK & DMC (JV)
- Date of Complete:
- Sept 18, 2018 (TL Section I, and GS), Dec 30, 2018 ( TL Section II)
- Funding:
- OPEC Fund for International Development (OFID).