The following facilities were developed under the project:
220/20kV Substation, (DABS 92-ICB-004), Syedabad
Construction of 220kV Sayedabad Substation was executed on behalf of KEC Int'l (DABS 92-ICB-004).
- Site improvement by Developing Slopes into terraces by constructing 845M long RCC/Stone Masonry
- (Av: 4 M high) Retaining walls. 1200 m long Boundary Wall & 800 m long Switchyard Fence.
- Construction of Control House Building, Equipment Foundations, 758 M long Cable Trenches, Walk Ways (1200 m long) & 2.3 Km long Drainage system lines.
- Provision of HVAC, Indoor/Outdoor Lighting System, Fire Fighting along with Fire Alarm arrangements.
- Installation of Four (4) Line Bays (CTs / VTs / CBs / Line Disconnectors / Bus Disconnectors)
- Installation of Two (2) Trafo Bays (CTs / VTs / CBs / Line Disconnectors / Bus Disconnectors)
- Installation of Two (2) Transformers 10/13 MVA
- Installation of MV Switchgear – 20 KV (2 + 15)
- Control & Protection System
- SCADA, SAS & Telecom
- Complete Testing & Commissioning of all installations, Control & Protection System, SCADA/ SAS etc.