ADB-105-2017 Lot II: 220kV Double Circuit T/B Transmission Line from Faisalabad West to Lallian Substation at 500/220/132kV Faisalabad West Sub-station (approx.55 km-Rail Conductor)

ADB-105-2017 Lot II: 220kV Double Circuit T/B Transmission Line from Faisalabad West to Lallian Substation at 500/220/132kV Faisalabad West Sub-station (approx.55 km-Rail Conductor) Faisalabad, Pakistan Client: Chief Engineer (Procurement & Material Management), NTDC 622-WAPDA House, Shahrah-e- Quaid-e- Azam, Lahore, Pakistan Time Period: 365 Days ADB-105-2017 Lot II: 220kV Double Circuit T/B Transmission Line from Faisalabad…

ADB-105-2017 Lot I: 500kV Double Circuit Q/B Transmission Line for Looping In & Out of existing 500kV Multan Gatti Single Circuit Transmission Line at 500kV Faisalabad West Substation (approx.40 km—Drake Conductor)

ADB-105-2017 Lot I: 500kV Double Circuit Q/B Transmission Line for Looping In & Out of existing 500kV Multan Gatti Single Circuit Transmission Line at 500kV Faisalabad West Substation (approx.40 km—Drake Conductor) Faisalabad, Pakistan Client: Chief Engineer (Procurement & Material Management), NTDC 622-WAPDA House, Shahrah-e- Quaid-e- Azam, Lahore, Pakistan Time Period: 365 Days ADB-105-2017 Lot I:…

Supply, Installation, Testing, Commissioning & Associated Civil Works For 132/11 Kv Rahim Yar Khan Industrial Estate Grid Station on Turnkey Basis

Supply, Installation, Testing, Commissioning & Associated Civil Works For 132/11 Kv Rahim Yar Khan Industrial Estate Grid Station on Turnkey Basis Rahim Yar Khan, Pakistan Client: GM (Planning & Contracts) PIEDMC HO, Commercial Area (North) Sundar Industrial Estate Sundar, Raiwind Road, Lahore Time Period: 548 days Supply, Installation, Testing, Commissioning & Associated Civil Works For…

Engineering, Procurement, Construction (EPC) Turn Key Work Regarding Capacity Enhancement of 132 KV D/C Shaheenabad – College Road Transmission Line Using High Temperature Low Sag (HTLS) Aluminum Conductor Composite Core (ACCC)

Engineering, Procurement, Construction (EPC) Turn Key Work Regarding Capacity Enhancement of 132 KV D/C Shaheenabad – College Road Transmission Line Using High Temperature Low Sag (HTLS) Aluminum Conductor Composite Core (ACCC) Gujranwala, Pakistan Client: Chief Engineer (Development) Gujranwala Electric Power Company Ltd. 565 A, Model Town, Gujranwala Time Period: 150 days Engineering, Procurement, Construction (EPC)…

Design, Manufacture, Supply, Erection, Testing & Commissioning of 132/11.5 KV (GIS) Grid Station DHA / EME – Sector Lahore on Turnkey Basis

Design, Manufacture, Supply, Erection, Testing & Commissioning of 132/11.5 KV (GIS) Grid Station DHA / EME – Sector Lahore on Turnkey Basis Lahore, Pakistan Client: The Chief Engineer, Defence Housing Authority, DHA Phase VI, Lahore Time Period: 365 Days Design, Manufacture, Supply, Erection, Testing & Commissioning of 132/11.5 KV (GIS) Grid Station DHA / EME…

GOLEN GOL Hydropower Project (Lot-4.2) Package-II Procurement / Design, Supply, Erection, Stringing, Testing and Commissioning of Grid station Extensions at Chakdara & Timergarah Grid station

GOLEN GOL Hydropower Project (Lot-4.2) Package-II Procurement / Design, Supply, Erection, Stringing, Testing and Commissioning of Grid station Extensions at Chakdara & Timergarah Grid station Chitral, Pakistan Client: WAPDA Time Period: 05 Nov 2015 ~ Aug 2018 GOLEN GOL Hydropower Project (Lot-4.2) Package-II Procurement / Design, Supply, Erection, Stringing, Testing and Commissioning of Grid station…